Guides
Practical guidance for contractors and site managers planning shrink wrap and temporary weather protection.
Scaffolding setup guide
Please review this before we arrive on site. Getting these details right means we can complete your project safely, efficiently and to a high standard.
Every area to be wrapped needs fully boarded, clear and safe access, with compliant handrails on every working lift. Our installers must be able to reach every part of the sheeting area comfortably, with both hands free at the same time.
High winds and heavy rain can delay or suspend installation. We only start when the forecast gives enough time for every sheet to be fully welded and heat-shrunk before we leave site — partly shrunk sheets can move in the wind and damage welds.
Fix a horizontal sheeting rail to the outside of the scaffold at the top and bottom of the area to be wrapped. Where a horizontal join is needed (typically every six metres, or every three lifts), install two rails roughly 20cm apart.
Roofs need a minimum pitch of 15° so water drains away. Two handrails roughly 20cm apart should run around the scaffold, with roof sheeting rails fixed about 20cm below the boards. Boards should follow the pitch at regular intervals, with the toe board left off at the perimeter so the sheeting runs smoothly over the edge.
Access to the roof should be by ladder and a safety access gate at the side of the roof, to avoid leaks in the finished wrap.